
Hilton Hotel Bogota





- Construction
- Leisure & Tourism
Hilton Hotel Bogota
The Hilton Hotel Bogota opened 5 years ago in the booming Colombian capital of Bogota. Unfortunately the hotel faced serious problems with leakages of the originally applied waterproofing membrane on the roofs. Therefore the VIP partner Poliurea Colombia was given the task to provide and apply a quick but durable solution. The application had to be implemented in only 15 days during the rainy season and also with multiple contractors doing another duties at the same time in the area. Despite all these challenges Poliurea Colombia finished the project in record time to the fullest satisfaction of all parties due to its many years of experience and use of the high performance VIP Systems.
Application steps:
1) Removal of the old coating
2) Repair and preperation of the substrate
3) Application of VIP´s hot spray applied membrane
Application steps:
1) Removal of the old coating
2) Repair and preperation of the substrate
3) Application of VIP´s hot spray applied membrane
Reference details
Project description
Project EN
City
City EN
Country
Colombia
Size (in m²)
2000 m²
Year
2018
Customer
Hilton Hotels
Applicator
POLIUREA COLOMBIA S.A.S.
Consultant
Inhouse
Used products
QuickPrime 2K Epoxy SF21
Quick Prime 2K Epoxy SF 21 is a two-component modified epoxy resin specifically designed for sealing and priming concrete substrates. It`s unique ...
QuickSeal PP350
QuickSeal PP350 is a spray applied, instant curing flexible membrane that can be built to any thickness in one application.