Mercure Hotel
Mercure Hotel
  • Construction

Mercure Hotel

Mercure Hotel Kuala Lumpur Malaysia Restoration

The lobby of the hotel is situated directly above a water tank located at the basement.

Water marks could be seen coming up from the floor and after a thorough investigation, it was concluded that moisture was coming from up the water tank below to the floor through osmosis process. In order to resolve this issue, a layer of QuickSeal MP500 was applied above the tiles to prevent further moisture from rising to the ground level.

Process include mechanical grinding, application of primer and application of 2mm QuickSeal MP500.

The restoration process was completed in 2 weeks.

Reference details


Project description

Mercure Hotel Kuala Lumpur Malaysia Restoration

City

Kuala Lumpur

Country

Malaysia

Size (in m²)

500 m²

Year

2022

Customer

Mercure Hotel Malaysia

Applicator

Sunbes Specialist Services Sdn Bhd


Used products
Vip Kontakt Icon

Questions?

We are looking forward to your message.