Sea water discharge culvert
This seawater discharge culvert is located 250Km`s from Abu Dhabi at the Borouge Plastics plant. The culvert was leaking and seawater was permeating into the plant and causing corrosion of the plants pipes and infrastructure support systems. Long term structural damage was being done to the concrete culvert as well.
Being a major undertaking to rectify the problem a full plant shutdown was required. Long term rectification of the problem was the first priority however minimizing the shutdown time was also a high priority for the project engineers.
VIP Coatings was approached in the early stages of the project to provide a solution that not only provided a long term fix for the concrete structure and the plant infrastructure but also a solution that minimized the shutdown time required.
VIP`s Approved Applicator – Petro Projects, prepared the concrete substrate and primed the concrete according to VIP` s specifications after which they spray applied VIP`s “QuickSpray Industrial” flexible membrane lining. Petro Projects completed the entire 11 000+ m2 project in 12 days.
Reference details
Waterprofing of sea water discharge culvert
Abu Dhabi
United Arab Emirates
11000 m²
2012
Borouge Abu Dhabi
Petro Projects Group Est Abu Dhabi, UAE
Tebodin Middle East Ltd.
QuickPrime 1K PU-SF
Quick Prime 1K-PU universal SF is a single component, solvent free, polyurethane based primer. Being solvent free it is easy to handle and store ...
QuickFill - SL - Standard 600ml
QuickFill SL Standard is a low viscosity 2-component, 100% solids joint filler for static joints and crack repairs in concrete substrates. This ...
QuickSpray Industrial
QuickSpray Industrial is an instant curing, spray applied, seamless, and flexible protective membrane and sits in the middle of VIP`s high ...