VIP Coatings International
 Almasirah waste water treatment plant
Almasirah waste water treatment plant
  • Water & Wastewater

Almasirah waste water treatment plant

Concrete floor and GLS walls

The existing STP had few GLS tans with epoxy coated cocnrete
floors. the client complained from many leaks. so the
coating on the floor was mostly removed by grinder, and the
lower part of the GLS tanks was mechanically grinded as
well.The whole area to be coated was primed by a two-component
solvent-free epoxy primer after wiping all the prepared
area with Solvent to clean all traces of dust any other contaminants.
QUICKSPRAY INDUSTRIAL was specified and applied at
a thickness of 2.5 mm on all the floor up to 300 mm of the
GLS walls. Al-Gadrawi did the job in two weeks in May 2020.

Reference details


Project description

Almasirah waste water treatment plant

City

Yanbu

Country

Saudi Arabia

Year

2020

Customer

Almasirah

Applicator

Construction material chemical Industries

Consultant

Al-Gadrawi


Downloads

Download RS_GB_WW_Water_Treatment_Plants_Masirah_SWTP-Yanbu.pdf

Used products
Vip Kontakt Icon

Questions?

We are looking forward to your message.