TEST
VIP Coatings International
 Kaleshwaram Lift Irrigation Project
Kaleshwaram Lift Irrigation Project
  • Water & Wastewater
  • Infrastructure

Kaleshwaram Lift Irrigation Project

The Kaleshwaram project has provision for the storage of about 148 tmc ft with plans of utilising 180 tmc ft by lifting at least 2 tmc ft water every day for 90 flood days. The project is designed to irrigate 7,38,851 hectares (over 18.47 lakh acres) uplands in the erstwhile districts of Karimnagar.

VIP DELTA was awarded to provide a durable, high performance waterproofing and protection solution for the walls of the surge pool. This project was applicated by VIP´s well trained local application teams and supervised by the technical department.

The application was done in 3 steps:
1) A basic of shotcrete was applicated on the walls
2) 40 mm PU foam
3) The final Quick Seal PP350  membrane was applicated.
Quick Seal PP350 is a 100% pure Polyurea membrane with high tensile strength as well as good abrasion, impact and chemical resistance properties. The lining can be applied even under extreme climatic conditions (Hot, cold and humid).

Reference details


Project description

Waterproofing and protection solution for the walls of the surge pool.

City

Karimnagar, Telangana

Country

India

Size (in m²)

8200 m²

Year

2018

Customer

Telangana Govt (Irrigation Dept)

Applicator

VIP DELTA «Elite» applicators


Used products
Vip Kontakt Icon

Questions?

We are looking forward to your message.
We use cookies

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.